Get in touch with Zhenling Company
PEI First-Part Evidence Planner
Build a discussion list for the first PEI part and its release to repeat production. This planner does not create a certificate, select a quality standard, or replace a buyer’s contract.
Choose the project conditions
1. Control inputs
Drawing revision, material identity, stock condition, quantity, and acceptance characteristics.
2. Record first part
Agreed measurement, material, appearance, deviation, and disposition evidence.
3. Release or re-approve
Buyer approval plus defined triggers for changes to material, process, drawing, inspection, or supply route.
Suggested discussion scope
- Select the conditions and build the list.
The list expands only from the conditions you choose. A named industry format is included only when the buyer or contract requires it.


![Shop-Floor Carbon Steel CNC Machining Guide [2026]](https://zhenlingmetal.com/wp-content/uploads/2026/08/carbon-steel-cnc-machining-handbook-r2-featured-150x150.png)