Traceability, PMI and Passivation Checklist

Keep material identity, component inspection and surface acceptance as separate evidence objects.

0 of 15 fields resolved

1. Material identity

2. Drawing and dimensional acceptance

3. PMI and special checks

4. Passivation and surface acceptance

5. Release package

An EN 10204 material document, PMI record, dimensional report, passivation result and code approval serve different purposes. Checking one does not silently satisfy another.