01 No controlling revision
Programming, fixtures, and parts can follow different drawing packages
Issue a controlled 2D-and-3D package and state conflict precedence
02 No exact material or condition
Stock, machining, heat treatment, surface behavior, and acceptance can change
Set grade, condition, approved substitution rule, and required documents
03 No functional datum or interface map
A part can meet isolated dimensions yet miss the assembly intent
Map motion, mounting, bearing, shaft, flange, thread, seal, and sensor relationships
04 No validation question
A prototype may look complete without proving fit, load, wear, or environment
Choose the evidence route before choosing prototype material or process
05 Regulated or controlled project not qualified
Ordinary industrial scope review cannot replace application-specific compliance, safety, data, or export controls
Complete the required project and supplier qualification before sharing controlled information