Prototype-to-Production Handoff Checker

Check whether a prototype lesson has become a controlled repeat-order input. “Same part number” is not enough when revision, material, deviation or evidence status has changed.

Set the status of each handoff control

Governing drawing and modelThe released source and conflict rule are identified.
Revision and deviation statusApproved changes, expiration and obsolete files are controlled.
Material and heat-treatment conditionProduction stock and final condition match the approved definition.
Critical characteristics and datumsIdentifiers, references and final-condition checks remain visible.
Evidence class and acceptance basisFirst-piece, lot and sustained evidence are not treated as interchangeable.
Quantity, outside processing and destinationCommercial and downstream scope has been compared with the prior release.